Method statement for MVAC
is related to Installation, Testing and Commissioning of all the systems of MVAC.
Installation procedures of following areas shall be described throughout the
document.
·
VRF indoor and outdoor units installation
·
Roof top package units installation
· Refrigerant
pipe installation
· Drain
pipe work
· Ventilation
system
·
Diffuser and grill installation
·
Duct installation
·
Testing & Commissioning system
Apart from above
installation and testing process, preparation of shop drawings, material
handling and storing procedures shall be described with this document.
Installation,
material handling and storing process shall be carried out following with
approved health and safety procedure defined in this method statement.